Only one car in the lot
|
Electrical gear
|
Power & racks
|
Lots of overhead cabling
|
This much Cat6A is heavy & bulky
|
Plumbing for 10GE
|
Painstaking work
|
Hot aisle
|
Stu, our Data Center Systems Engineer
|
Old UPS (coming out)
|
Automatic switch from Con Ed to generator
|
Very Matrixy: 96 patch points
|
Cat6A endoskeleton & exoskeleton. Twisted!
|
Liebert *LOVES* Stu
|
Another excavation
|
Lots of plumbing (also some blue, but not data)
|
Pit
|
The driveway between Founders and Flexner is pretty much gone for now
|
Big cat
|
I wonder what kind of license he needs
|
The pit!
|
No Parking
|
Trenching
|
Holes within holes
|
Navigational hazards
|
Center aisle & busy ceiling
|
Considerable expansion
|
East aisle, looking north
|
Air handling
|
Scrap plastic
|